Deutsch (Deutschland)English (United Kingdom)
page width: font size:

Screw/Screw Connection Technique without overvoltage protection

Mit Überspannungsschutz Cables are to be skinned and the protection is being pushed back before using the Screw/Screw Connection Technique.

Also, the insulation of the individual cable conductor is to be removed except for a length of 5 mm. Then every conductor is being seperataly inserted in a clamp where it is to be screwed, thus providing an electrically conductive connection.

In this version the distribution boxes are not equipped with overvoltage protection.

Infobox

Contact - Sales

SCHIEDERWERK
GmbH & Co. KG

Neuburger Straße 40
90451 Nürnberg
Germany

Phone 00 49 911 / 96 36-990
Fax 00 49 911 / 96 36-600

sales@schiederwerk.de

 

 

 

 
© 2009 SCHIEDERWERK GmbH & Co. KG webdesign: bauer+bauer